chris@padmecMay 12, 20181 min readThursday 24th November 2016Work gets underway with the leveling of bend 2 and the back straight. Medium density blocks are being used to bring the track back up to the correct level.0 views0 comments
Work gets underway with the leveling of bend 2 and the back straight. Medium density blocks are being used to bring the track back up to the correct level.