Thursday 10th November 2016



Over the past two Thursdays, we have been inspecting the condition of the straight section between bends three and four, known as "the back straight". It was this section that had to be removed when Southern Water installed the storm water tank. Surveying this section revealed that all the pillars have dropped by about 100mm due to the concrete pad, installed by the storm tank contractors, breaking up. To rebuild all the pillars effected over this winter ready for next season is not possible. Therefore it has been decided to temporarily pack up the pillars this winter, with full corrective action being carried out during 2018 and 2020. 

0 views
INSTANT MESSAGE US
EMAIL US
OPENING HOURS

Sundays 14:00 - 17:00, May - September

GIVING TRAIN RIDES FOR PUBLIC OVER 25 YEARS

We moved from Pevensey Bay, a long time ago now. To our new site in Polegate, the years have passed by and with all the developments it has become the best hidden railway in town.

WHAT WE OFFER

- Public Running Dates

- A Large Wealth Of Engineering Advice

- Driver Experiences

- Membership

- Event Location for your special day

- Community Club/Organisation Events

VISIT US

William Daly Recreation Ground, Brightling Rd, Polegate, BN26 5AY

  • Facebook Social Icon
  • Twitter Social Icon
  • YouTube Social  Icon
  • Flickr Social Icon

© 2018 by C. White. Proudly created with Wix.com